wellington regional medical center

Reduce Construction Cost Overruns and Schedule Delays

Assisted Living projects are often complicated and risky. Infection control, safety, durability, and ease of maintenance have become increasingly important, often resulting in construction cost overruns and schedule delays. Why assume this additional risk when you don’t have to?

A Cutting-edge Solution to Assisted Living and Senior Housing Construction

Oldcastle SurePods™ offer a cutting-edge solution, healthcare prefab bathrooms that eliminate the uncertainty of building hospital bathrooms. Built to exact design specifications, SurePods™ bathroom pods offers exact building tolerances, crevice-free solid surfaces and high-quality enhancements consistent with today’s healthcare-related building trends. And because they’re built in a factory setting, all bathrooms are delivered to the job site with the same, consistently high quality, ready to install – with no punch list.

Take a look at the illustration below to show the potential for schedule savings, the Oldcastle SurePods™ value proposition is hard to ignore, especially in the assisted living sector.

linear chart depicting the time savings when using prefab bathrooms

SEE OUR WORK

SurePods has several examples of bathroom pods built for assisted living construction projects. Visit our project portfolio to see examples.

Assisted Living