fort carson military barracks

Details

120 bathroom pods

Location:

Fort Carson, CO

Owner:

Army Corps of Engineers

General Contractor:

Mortenson

Architect:

TranSystems

 

Completed 2012


Project Notes – Military Barracks Fort Carson

 

This four-story, 96,400-sq-ft building consists of two wings with living quarters connected by a common area and a large outdoor courtyard with seating. It has 40 two-bedroom, two bath units; and 40 two-bedroom, one bath units. All apartments have shared kitchens and dining areas.

Oldcastle SurePods manufactured all of the factory built bathrooms for the project. The bathrooms featured ceiling height tile and ADA fixtures for ease of maintenance and access by the soldiers returning from war.

The design-build team was able to achieve a LEED-Gold project certification. Additionally, the project team earned the National DBIA Award for this Fort Carson Project.

Share on your social media